A Look at the Locker Rooms

Early Morning Classroom Wing Slab Pour

Classroom Wing Slab Pour

Locker Room Wall Installation

Crane Ready for Structural Installations

Crane Overlooking Gym Area

Boys Locker Room Slab Pour

Tennis Court Completed

Friday, April 18, 2014

Drywall and Block Work

Administrative Addition Brick Installed

Main Entry Trophy Case

Administrative Wing Drywall

Administrative Wing Drywall

Cafeteria Slab Poured

Kitchen Block Work

Friday, March 21, 2014

Inside the New Cafeteria & Kitchen

New Main Entry Framing

Administrative Wing Exterior

Administrative Wing Interior Framing

Cafeteria & Kitchen Structure

Inside the New Cafeteria

Kitchen Underground Rough In


Spring Break 2

Tennis Court Surfacing
Area A & B Concrete Footings and Walls
Area A & B Concrete Footings and Walls

Temporary Exit Corridor Construction


Spring Break