Thursday, October 24, 2013

Circle High School Phasing

                                              

Phase 1 of construction consists of the site development package.
Work includes site excavation, grading, tennis courts and site electrical.
                                              

Phase 2 of construction consists of partial building construction.
Work includes construction of three education wings and new competition gym.
                                              

Phase 3 of construction consists of partial building construction and demolition.
Work includes demolition of existing media center, classrooms and gymnasium,
and construction of administration area, media center and black box.
                                              

Phase 4 of construction consists of partial building construction and demolition.
Work includes demolition of remaining existing building and
remodel of entrance to existing auditorium.

Tuesday, October 22, 2013

Inside and Out

Area B (South) Classrooms
 
Area B Classroom Wall Framing

Area B Hallway Wall Framing

Area A (East) Brick

Area A Brick Installation

Area A Insulation Installation


Friday, October 18, 2013

Blast From The Past

Special thanks to PKHLS Architecture for digging into their archives and sharing these photos from the original construction of Circle Oil Hill Elementary.

Original Rendering of Circle Oil Hill Elementary













Friday, October 11, 2013

Moving Right Along... And Up

Area A (East) Classroom Additions

Area A Roofing


Area B (South) Classroom Addition

Area B Sloped Roof Installation

Brick Installation on East Addition 

Ductwork Installation

 Interior Wall Framing & Rough In